    Safety standards for nuclear waste disposal – guide

    eub2By eub24 November 2010 Post No Comments6 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email
    — last modified 04 November 2010

    The European Commission has proposed safety standards for disposing spent fuel and radioactive waste from nuclear power plants as well as from medicine or research. In the Directive put forward today, EU Member States are asked to present national programmes, indicating when, where and how they will construct and manage final repositories aimed at guaranteeing the highest safety standards. With the Directive internationally agreed safety standards become legally binding and enforceable in the European Union.


    Advertisement


     Why is the Commission proposing the Directive?

    More than 50 years after the first nuclear power plant become operational (1956 Calder Hall, UK), there are still no final repositories for nuclear waste in the whole European Union. Some Member States such as Sweden, Finland and France are in the planning phase.

    To minimize the risk of contamination, the EU is proposing high safety standards covering both the management of highly radioactive waste from nuclear power plants and waste generated in research, medicine and industry.

    What happens with highly radioactive waste at the moment?

    The majority of highly radioactive waste from nuclear power plants is put in interim storages. While these interim storages are necessary for fuel elements and high level waste to reduce temperatures and to decrease radiation levels, they are no long term solution as they need continuous maintenance and oversight by people. As they are typically close or on the surface, there is in addition a risk of accidents, including airplane crashes, fires or earth quakes.

    An interim storage has a lifespan of maximal 50 – 100 years, whereas high level waste from nuclear power plants has a decay up to 1 million years. This means that waste stored in interim storage has to be retrieved and repackaged.

    What is the best solution?

    There is a broad consensus among scientists that deep geological disposal is the most appropriate solution for the final disposal of high level nuclear waste. This consensus is based on scientific work over 30 years. In 2009, nearly 200 scientists and engineers from some 70 organizations have recommended deep underground geological repositories for highly radioactive waste in their report “Strategic Research Agenda” (www.snetp.eu).

    Out of all technologies available today, geological disposal is the safest option. It also means passive safety. There is no need for human action, and radioactive waste can be stored forever there.

    What is the EU proposing?

    * Member States have to draw up national programmes within four years of the adoption of the Directive. As the adoption is expected for 2011, this means end of 2015. National programmes should include: plans for the construction and the management of final disposal facilities, laying down a concrete time table for the construction, with milestones and the description of all the activities that are needed to implement the disposal solutions, costs assessments and the financing schemes chosen.
    * National programmes have to be notified. The Commission may ask Member States to modify their plans.
    * Two or more Member States can agree to use a final repository in one of them. It is not allowed to export nuclear waste to countries outside the EU for final disposal.
    * The public must be informed by Member States and should be able to participate in the decision making on nuclear waste management.
    * Safety standards drawn up by the International Atomic Energy Agency become legally binding. This includes an independent authority which grants licences for building repositories and checks the safety analysis for each individual repository.

    Do you propose how deep the geological deposit should be?

    No. There is no recommendation on the depth in the Directive. Geological conditions are very different. This is why it is up to the Member States to define the depths according to the site specific situation. Every site must be evaluated according to its specific situation.

    Is the EU pushing nuclear energy with this proposal?

    The energy mix is a national competence. The EU respects the decision of every Member State, whether it has opted for or against nuclear policy. It is in the interest of all citizens that nuclear waste is disposed in a safe way, and people, water and the ground is protected against nuclear contamination. If an accident happens in one country, this can have devastating effects in others.

    Have Member States to decide on repositories sites within four years?

    No. National programmes have to be presented to the Commission at the latest four yours after adoption of the Directive (2015). Programmes should include plans for the development and the construction of repositories. This can mean that they describe that they will start analysing different sites and also state when they intend to make the decision.

    Is there a deadline for repositories?

    The Directive does not fix a deadline for constructing or opening repositories.

    What if the public is against building a repository close to them?

    The Directive says that the public must be informed by Member States and be able to participate in the decision making. In Sweden, the site searching process was handled in a very transparent manner, resulting in two municipalities – Östhammar and Oskarshamn – wanting to have the repository. Local organisations following the project received several million Euro to finance their own activities and studies. A citizens’ council was established, more than 60 consultation meetings were held.

    Acceptance and finally keen interest of the population in both communities was also due to the prospects for jobs and tax income.

    Who has plans for repositories?

    Finland plans to have its repository operational in 2020, Sweden in 2023, France in 2025.

    Who should finance the repositories?

    In its 2006 Recommendation, the Commission asks the operator of nuclear power plants to put money aside for the financing future disposals. In some Member States there are also national funds.

    When will the Directive be in force?

    Member States have to transpose the Directive into national law within two years from adoption by the Council. Adoption is expected for 2011, this means 2013. National programmes have to be presented within four years of adoption. This could mean end of 2015.

    Which Member States have nuclear power plants? And how many?

    In the European Union 143 nuclear power plants are in use: Belgium (7), Bulgaria (2), Czech Republic (6), Finland (4), France (58), Germany (17), Hungary (4), Netherlands (1), Romania (2), Slovakia (4), Slovenia (1), Spain (8), Sweden (10), and UK (19). Italy and Poland plan to built nuclear power plants.

    How much nuclear waste from reactors needs to be disposed?

    7 000 cubic meters of high level waste are typically produced every year in the EU. High level waste is the part of reprocessed spent fuel from nuclear power plants which cannot be re-used and has therefore to be disposed forever.

    Proposal for a Council Directive on the management of spent fuel and radioactive waste

    Source: European Commission

    Add A Comment

    Leave A Reply Cancel Reply

    You must be logged in to post a comment.

    eub2
    • Website

    eub2 is the default publisher for EUbusiness.

    Related Content

    EU Agenda: Week Ahead – 11-16 November 2024

    How cities are adapting to host major gatherings

    The truth about walk-in baths and why it’s a game-changer for the modern bathroom

    Why 918kiss APK Is the Ultimate Casino Experience for Mobile Users

    The future of family offices: trends and predictions for the next decade in Europe

    European economic recovery is good news for Bitcoin’s price

    LATEST EU NEWS

    EU approves EUR 300m for common defence procurement projects

    14 November 2024

    EU proposes e-declaration for the posting of workers

    14 November 2024

    EU calls on Apple to end geo-blocking on media services

    14 November 2024

    EUR/USD touches one year low as Trump takes control of Congress – Euro currency news daily

    14 November 2024

    EU artificial intelligence factories set for 2025

    13 November 2024
    BRIEFING

    Agenda

    This week, COP29 begins in Azerbaijan; finance ministers discuss the EU's annual budget for 2025; and MEPs hold a plenary session on EU-US relations, EU summits, deforestation and COP 29...

    EUbusiness Week

    This week competitiveness and environment ministers will hold informal meetings…

    Eurozone Economic Calendar

    Key economic calendar events for the week 11 to 16 November 2024

    The Week's Top Stories

    This week competitiveness and environment ministers will hold informal meetings…

    Advertisement

    Subscribe to EUbusiness Week

    Get the latest EU news

    Latest Posts

    EU approves EUR 300m for common defence procurement projects

    14 November 2024

    EU proposes e-declaration for the posting of workers

    14 November 2024

    EU calls on Apple to end geo-blocking on media services

    14 November 2024

    EUR/USD touches one year low as Trump takes control of Congress – Euro currency news daily

    14 November 2024

    CONTACT INFO

    • EUbusiness Ltd 117 High Street, Chesham Buckinghamshire, HP5 1DE United Kingdom
    • +44(0)20 8058 8232
    • service@eubusiness.com

    INFORMATION

    • About Us
    • Advertising
    • Contact Info

    Services

    • Privacy Policy
    • Tems
    • EU News

    SOCIAL MEDIA

    Facebook
    eubusiness.com © EUbusiness Ltd 2025
    Design and developed by : Dotsquares

    Type above and press Enter to search. Press Esc to cancel.

    Sign In or Register

    Welcome Back!

    Login below or Register Now.

    Lost password?

    Register Now!

    Already registered? Login.

    A password will be e-mailed to you.

    We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok